Wednesday, October 8, 2014

We're close

There's been a lot of activity at the house the past few days.

Outside, they've paved the driveway and front walkway. They have also started the yard - just waiting on the top soil.

On the inside they've pretty much installed all the light and plumbing fixtures and our tankless hot water heater is in.  They also spent a lot of time this week “perfecting" everything. They were leveling door trim, straightening cabinet doors, and doing drywall touch up in preparation for another paint next week. AND today, they have installed the hardwood floors. I'm really happy with the way it turned out. I was really concerned the room would look really dark with the floors installed. The kitchen looks really nice now - although I don't love the look of the appliances. Wish we could have had more options. 

Left to do is paint the inside, stain the railing, install the french doors for the morning room, put carpet in and finish the yard. Last week I was concerned they wouldn't finish in three weeks. Now I'm wondering why they won't be finished next week. Oh well, I like that they left time for repairs and to perfect everything.

Kitchen. We're planning to add under cabinet lighting and a backsplash
After closing. 

Another view of the kitchen. Worker still there putting in floor so we left and came back later to see the finished product. 

When we got back everything was locked so I took this picture from the sidelight. 


 