Monday, October 6, 2014

Locked out

In the last post I complained about the lack of progress. Over the past few days, there's been a little activity. They have installed our granite countertops, laundry room countertop, door handles, decorative columns, vents and outside HVAC units, ovens and our cooktop. Seems like a lot after writing it but they did this over the span of four days. With only 3 weeks away until closing, I think they need to pick up the speed big time. They still need to do more drywall work, paint, put down floors, install toilets faucets, shower doors, towel bars, stain the railings, install the dishwasher, microwave, office French doors, washing machine, dryer, refrigerator and a lot more. On top of that, they haven't started to grade the yard, haven't poured the front porch or the walkway. And even more, the tile around the master bathroom shower is not level across the top, the front door and morning room door don't shut properly, and they have to replace a broken window. Think they need to pick up the pace at some point. 

For the past few days we've been able to go inside the house using the morning room door, which is 5 and half feet above the ground. The front door has been locked and the garage has been closed. After they installed the appliances today, they locked all doors, but we were able to get pictures first. We won't be able to track progress daily anymore because we'll need an escort.

I'm confident the PM will pull the troops together and make great progress in the next few days. The next post should have plenty of photos. 









No comments:

Post a Comment